FL
2016년 12월 26일
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
GV
2020년 9월 9일
It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.
교육 기관: Jason K
•2020년 10월 5일
i would have liked more hands on instruction with the scheduling programs. we can purchase these but if you make a mistake, no one is there to grade or help.
교육 기관: Orlando J P P
•2018년 10월 28일
Overall a good course. An improvement could be a capstone component to this specific course to showcase the material learned across the full duration.
교육 기관: Vivek P
•2020년 6월 19일
I find this course very interesting and I have learn alot form this . I like the vidoes as they explained the theoretical concepts with examples
교육 기관: Jatin M
•2016년 11월 22일
Very briefly covered and clearly explained, but in my opinion it needs to add more on Risk assessment and management, and baseline scheduling.
교육 기관: Joseph W K
•2020년 11월 5일
Good course. Some speakers could have used better real life examples to illustrate their concepts but overall very interesting
교육 기관: Gerry J
•2021년 4월 29일
There are some technical difficulties that need to be worked out when completing the pop up questions.
Great course overall.
교육 기관: Patsy L
•2018년 10월 17일
Love the first part of the course as there were lots of exercises. The second part of the course is more theoretical.
교육 기관: Amar M
•2021년 10월 23일
Week 5 wasn't that productive in terms of keeping me on with activities like other weeks. Overall great course!
교육 기관: Tamir G
•2020년 1월 20일
From the entire coarse I learned systematic basic knowledge about "what I should know about scheduling''.
교육 기관: Juan P C
•2017년 10월 16일
Great introductory course for non civil engineers or architects that want to get involved in the industry
교육 기관: Donavan E
•2019년 10월 10일
I feel that the softewares used in this industry was not presented properly. the visual aids were poor
교육 기관: Ram j
•2020년 5월 16일
Informative. I would recommend taking the course to understand the basics of construction scheduling.
교육 기관: Erich S
•2020년 7월 20일
I like the calculations. The Lean guy, Sam Spata covers too much too fast during his lectures.
교육 기관: Kalamba B
•2020년 7월 3일
like this course, but much deeper learning would be more welcome on certain topics. thank you
교육 기관: Elodie T
•2020년 5월 3일
Complete courses, but pity that some of the projection like software modules are bad quality.
교육 기관: joshua w
•2017년 5월 13일
Very informative and helps to look at other not traditional scheduling methods.
교육 기관: Wiadita D A
•2021년 5월 4일
The risk allocation and planning section is a bit difficult to understand.
교육 기관: Diego A
•2020년 5월 13일
The first three weeks of the course are way too basic and slow to develop.
교육 기관: Michelle W
•2021년 3월 17일
I wish it wasn't "about" scheduling, but instead actually had scheduling.
교육 기관: Zhanar B
•2017년 2월 10일
I like the course for its clear structure and straightforward content.
교육 기관: Detorrie T
•2018년 4월 5일
This was a fast-paced and intense course brimming with great content.
교육 기관: Aleksandra A
•2020년 12월 4일
I expected to see more examples of real-life construction projects.
교육 기관: Kevin S
•2020년 6월 7일
Great intro to construction scheduling, from project flow to tech.
교육 기관: Jelin S
•2022년 7월 24일
really good , there was need for better explaination of softwares
교육 기관: amr e
•2017년 10월 22일
good course with a great experience as a beginner in scheduling.