Activities in a Construction Project

video-placeholder
Loading...
강의 계획표 보기

배우게 될 기술

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

검토

4.8개(1,666개 평가)

  • 5 stars
    79.65%
  • 4 stars
    17.88%
  • 3 stars
    1.98%
  • 2 stars
    0.30%
  • 1 star
    0.18%

GV

2020년 9월 9일

Filled StarFilled StarFilled StarFilled StarFilled Star

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF

2020년 5월 13일

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

수업에서

Types of Construction Activity Relationships

This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.

강사:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Coursera 카탈로그 살펴보기

무료로 참여해 맞춤화된 추천, 업데이트 및 제안을 받아보세요.