Backward Pass Calculations

Loading...
강의 계획서 보기

배우게 될 기술

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

검토

4.8(1,427개의 평가)
  • 5 stars
    79.67%
  • 4 stars
    18.07%
  • 3 stars
    1.68%
  • 2 stars
    0.35%
  • 1 star
    0.21%
GV
2020년 9월 9일

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF
2020년 5월 13일

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

수업에서
Forward and Backward Pass Calculations

강사:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Coursera 카탈로그 살펴보기

무료로 참여해 맞춤화된 추천, 업데이트 및 제안을 받아보세요.