Numbering Nodes on a Diagram

Loading...
강의 계획서 보기

배우게 될 기술

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

검토

4.8(912개의 평가)
  • 5 stars
    725 ratings
  • 4 stars
    166 ratings
  • 3 stars
    16 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

수업에서
Activity on Arrow
Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

강사:

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Coursera 카탈로그 살펴보기

무료로 참여해 맞춤화된 추천, 업데이트 및 제안을 받아보세요.